Introduction to SB9 Bill

California Senate Bill 9 (SB9), officially known as the California HOME Act (Housing Opportunity and More Efficiency), represents one of the most transformative changes to residential zoning in California.

What SB 9 allows California property owners to explore

SB 9, the California HOME Act, creates two related paths: a housing development with no more than two primary units, an urban lot split creating two parcels, or both. Qualifying proposals receive ministerial approval under Government Code sections 65852.21 and 66411.7. Ministerial review means staff check objective requirements rather than hold a discretionary hearing or decide personally whether the project is wise. Eligibility still matters.

HCD's September 2024 fact sheet explains that the parcel must be in a single-family residential zone. Multifamily, commercial, agricultural and mixed-use zones are not subject to SB 9 mandates merely because they allow a house. Ask planning staff to confirm the actual zone classification and applicable urbanized-area or urban-cluster eligibility, rather than relying on the property's appearance.

Two primary units and how ADUs / JADUs fit without overpromising

HCD distinguishes primary residences from accessory dwelling units and junior accessory dwelling units. An ADU provides independent living facilities alongside a primary residence; a JADU is a distinct accessory category within a single-family residence. Do not treat the three labels as interchangeable when describing your proposal.

Without a lot split, SB 9 can allow up to two primary units, with ADU/JADU law applying separately. With a qualifying urban lot split, local agencies must accommodate up to two units on each resulting parcel, subject to the statute. Primary units, ADUs and JADUs count toward that two-unit-per-parcel limit; agencies need not allow additional units under the combined provisions. These are legal pathways, not a guaranteed property yield. Eligibility, objective standards and site constraints determine what can proceed.

Urban lot split basics

Section 66411.7 describes approximately equal parcels: neither may be smaller than 40 percent of the original lot area. Each resulting parcel must ordinarily contain at least 1,200 square feet, although a local ordinance may allow smaller parcels. Ask how the proposed boundaries satisfy these rules before treating a conceptual dividing line as an approved subdivision.

A parcel created through this urban lot-split process cannot be split again under the same statute. A split also fails the eligibility test if the owner, or someone acting in concert with that owner, previously used this process to subdivide an adjacent parcel. Check ownership and subdivision history rather than assuming neighboring lots can follow an identical sequence.

Jurisdictions may require easements for public services and facilities, and access to or adjacency to a public right-of-way. They may not condition the statutory parcel map on dedication of rights-of-way or construction of offsite improvements. Access and dedication are different questions; have the responsible professionals identify the applicable requirements.

Occupancy and rental conditions

An urban lot-split applicant must generally sign an affidavit intending to occupy one unit as a principal residence for at least three years from split approval. The statute exempts specified community land trusts and qualified nonprofit corporations. This is a lot-split condition, not a blanket owner-occupancy rule for every SB 9 development. Rentals of units created through these provisions must be for terms longer than 30 days.

Eligibility themes, anti-displacement, and site constraints

Review these screens with planning staff and qualified counsel:

  • Protected or hazardous land: statutory cross-references address farmland, wetlands, certain fire, flood and earthquake hazard areas, conservation lands and wildlife habitat. Definitions and exceptions matter; a broad map label alone is not a parcel-specific determination.
  • Historic resources: current provisions distinguish listed landmarks, contributing structures and protected alterations within historic districts. Do not assume every district parcel has the same status.
  • Housing protections: demolition or alteration of certain affordable, rent-controlled or tenant-occupied housing can prevent eligibility. Tenant occupancy within the last three years is a key screen; it is not simply a blanket ban on every property that ever had tenants.
  • Rental withdrawals: check the applicable restrictions involving Ellis Act withdrawals within the preceding 15 years.

Objective zoning, subdivision and design standards still apply. Generally, standards cannot physically preclude the protected two-unit development or units of at least 800 square feet. Side and rear setbacks are a specific exception: an agency may require up to four feet, not a statewide four-foot minimum. Existing structures, or replacements in the same location and dimensions, receive the statute's no-setback treatment.

Offstreet parking may be required up to one space per unit, with exceptions for qualifying transit proximity or a nearby car-share vehicle. Confirm the statutory walking-distance and location tests rather than assuming any bus service qualifies. The Coastal Act also remains applicable; SB 9 does not erase all other approvals.

SB 450 (2024) updates that strengthen SB 9 timelines and standards

SB 450, Chapter 286 of 2024, amended both sections for the 2025 implementation period. A completed application for a qualifying housing development or urban lot split must be approved or denied within 60 days of receipt; otherwise, the statute provides deemed approval. Denial requires written comments identifying deficiencies and how to remedy them. Track completeness, not merely the first inquiry or upload.

For SB 9 housing developments, objective standards generally must apply uniformly within the underlying zone; more permissive standards are allowed. SB 450 also removed the separate physical-environment denial basis. Current law retains a written building-official finding of a specific adverse public-health-and-safety impact without feasible mitigation. These provisions do not guarantee construction approval or eliminate eligibility screens. Later amendments are reflected in the current code linked below.

What this means before you hire anyone or file

Confirm the zone and urban eligibility, then request the agency's current SB 9 development and subdivision checklists. Describe whether you propose two primary units, a split, or both. Keep accessory-unit questions separate. Record applicable standards, unresolved site constraints, application-completeness dates and written responses before commissioning a proposal based on assumptions.

This is general information for California homeowners, not legal advice. Current statutes and applicable local ordinances control. Consult your city or county planning department and a qualified land-use attorney for parcel-specific advice.

Sources

Checked November 7, 2026 for this added guidance: Government Code 65852.21; Government Code 66411.7; SB 450, Chapter 286; HCD September 2024 SB 9 Fact Sheet; and HCD Duplexes and Lot Splits fact sheet. Current statutory text takes precedence over older summary language.