Building an accessory dwelling unit in Suisun City, in Solano County, is governed by the City's zoning code, not by a generic Bay Area template. The current ADU and junior ADU (JADU) rules are in Suisun City Municipal Code Section 18.30.170 and Table 18.31.01. The City Council adopted Ordinance 825 on April 21, 2026, amending those provisions, along with the definitions in Section 18.04.010, to comply with recent changes in state ADU law. The ordinance took effect 30 days after passage. The City's notice of adoption states that the update was prepared in response to correspondence from the California Department of Housing and Community Development (HCD) about the need for compliance and consistency with state law.

This guide explains how to plan, design, and permit an ADU in Suisun City, then summarizes Section 18.30.170 as published after Ordinance 825. Confirm the current text, including Table 18.31.01, with the City's Development Services Department before you finalize a design.

What is an ADU?

An accessory dwelling unit is a secondary housing unit on the same lot as an existing or proposed primary dwelling. It is a fully functional living space with its own kitchen, bathroom, and sleeping area. Common types include:

  • Detached ADU: a new standalone structure, or a conversion of an existing detached accessory building.
  • Attached ADU: a unit that shares a wall with the primary residence, often created as an addition or by converting attached space.
  • Garage Conversion: an existing garage turned into living space. For the state-exempt units in Section 18.30.170, the City shall not require replacement of off-street parking if a garage, carport, or covered parking structure is demolished or converted in conjunction with the ADU application.
  • Junior ADU (JADU): a unit of up to 500 square feet, created within the existing or proposed space of a single-family dwelling. It may have its own sanitation facilities or share them with the house.

An ADU can house a family member, serve as a long-term rental, or add flexible living space on the lot. Suisun City's code requires that any rental of an ADU or JADU be for a term longer than 30 days.

Why build an ADU in Suisun City?

Accessory dwelling unit

Ordinance 825 split the City's ADU rules into two tracks, which is the most important local planning fact for a Suisun City lot:

  • State-exempt units under Section 18.30.170(A) are reviewed only against the specific state standards listed in that subsection. The City shall not apply any additional objective development or design standards in that review, except as Government Code Section 66323 expressly authorizes.
  • Units that are not state-exempt under Section 18.30.170(B) must meet the City's additional objective standards, including the size table, a rear-yard location rule for detached units, and Parking rules with the state-law exceptions.

That structure is meant to implement Government Code Section 66313 and the rest of the state ADU chapter. If a handout or checklist seems stricter than Section 18.30.170 or state law, ask Development Services in writing which rule applies.

Schedule a free appointment with our ADU experts

How should you plan a Suisun City ADU?

Confirm the zone and the unit category

State-exempt ADUs and JADUs are available on lots in a residential or mixed-use zone. Start by confirming the lot's zoning and whether you are proposing a conversion, a new detached unit, a JADU, or a unit on a multifamily lot. That choice decides whether the City may apply only the state standards or also the local objective standards in subsection (B).

Think about location on the lot

For a detached ADU that is not state-exempt, the code says the unit shall be located in the rear 50 percent of the lot, unless that standard would preclude development of a detached ADU, in which case it may be located within the front 50 percent of the lot. Side and rear setbacks shall not be less than four feet. If the rear-yard rule would block a unit that state law requires the City to allow, ask the City in writing how it will apply the location standard.

Budget from actual bids, not a generic range

Costs depend on the site, the unit type, utility work, and fees. This guide does not quote a construction price range. Get itemized bids, and confirm current fee amounts with the City and with any utility or school district that charges its own fees. Section 18.30.170(B) states that no impact fees other than school impact fees shall be charged for ADUs or JADUs with 750 square feet or less of interior livable space, and that school impact fees may be imposed on units greater than 500 square feet of interior livable space.

What should the design and plans include?

ADU kitchen

Work with a licensed architect or designer on complete plans for the building permit application. The plans should show interior livable space, height, four-foot side and rear setbacks where they apply, independent exterior access for converted space, the kitchen or efficiency kitchen, and any demolition or conversion of a garage or carport.

  • Function: size the layout for how the unit will actually be used, with clear circulation and enough room for living, sleeping, cooking, and sanitation.
  • Natural Light and efficiency: use windows for daylight and plan Insulation and building-code energy features as required at the time you apply.
  • Height: a state-exempt detached ADU on a single-family lot is limited to 16 feet, and a detached ADU on a lot with an existing or proposed multifamily, multi-story dwelling is limited to 18 feet. In both cases, the code points to Table 18.31.01, Note 3, for exceptions. Ask the City which height exceptions in that note apply to your lot.

How does Suisun City review an ADU application?

For a state-exempt ADU or JADU, the City shall ministerially approve an application for a building permit. The clocks in Section 18.30.170(A) are:

  • Completeness: a completeness determination shall be made within 15 business days of receipt of the application.
  • Decision: within 60 days following submittal of a complete application, the City shall approve an application that meets the state standards.

Approval of a state-exempt unit shall not be conditioned on correction of pre-existing nonconforming zoning conditions. Fire sprinklers shall not be required for the ADU or JADU if they are not required for the primary residence. Submit the application through the City's building permit process, and ask Development Services whether any planning review is needed for a unit that is not state-exempt.

Schedule a free appointment with our ADU experts

What should you expect during construction?

Hire a licensed contractor and define the scope of work in writing, including inspections, utility connections, and any conditions that came with the permit. Keep construction within the approved setbacks and building envelope. The unit is not ready for use until it has passed final inspection and the City has authorized occupancy.

If you convert or demolish a garage as part of the project, confirm in the approved plans that replacement parking is not being required, consistent with Section 18.30.170. Finish work and landscaping can support curb appeal, but they do not replace the objective standards the City used to review the application.

Can you rent a Suisun City ADU?

ADU bedroom

For both state-exempt units and units that are not state-exempt, the rental of any ADU or JADU must be for a term longer than 30 days. Plan leases and advertising around that rule, and confirm any other rental or business-license requirements with the City before you list the unit.

Suisun City's ADU rules in 2026 (Municipal Code Section 18.30.170)

The summary below follows Section 18.30.170 as amended by Ordinance 825, adopted April 21, 2026 and in effect 30 days later, together with the City's notice of adoption and Government Code Sections 66310 through 66342. The code also amends Table 18.31.01, Development Standards in Residential Zones, for accessory dwelling units. Confirm that table, including Note 3, with the City.

State-exempt units the City must approve ministerially

Section 18.30.170(A) lists mandatory approval categories. The City shall not apply additional objective development or design standards except as Government Code Section 66323 expressly authorizes. Those categories include:

  • Converted single-family space: one JADU within the existing or proposed space of a single-family dwelling, plus one ADU within the existing or proposed space of a single-family dwelling or an existing accessory structure, with independent exterior access. Side and rear yard setbacks are a minimum of four feet, or as required for fire and safety.
  • Detached single-family ADU: one detached, new-construction ADU on a lot with an existing or proposed single-family dwelling, with minimum four-foot side and rear yard setbacks, not more than 800 square feet of interior livable space, and a maximum height of 16 feet, subject to the exceptions in Table 18.31.01, Note 3.
  • Converted multifamily space: at least one unit, and up to a number equal to 25% of the existing multifamily units, created within the interior of an existing multifamily dwelling in an area not used as livable space, such as storage areas, boiler rooms, attics, or garages.
  • Detached multifamily ADUs: up to eight detached ADUs on a lot with an existing multifamily dwelling, or up to two detached ADUs on a lot with a proposed multifamily dwelling, with minimum four-foot side and rear yard setbacks, not more than 800 square feet of interior livable space, and, for a detached ADU on a lot with an existing or proposed multifamily, multi-story dwelling, a height of no more than 18 feet, again subject to Table 18.31.01, Note 3.

Standards for units that are not state-exempt

Subsection (B) applies to lots in residential or mixed-use zones where a primary dwelling exists or is proposed, and it is intended to implement Government Code Section 66313 and following. For ADUs that do not qualify as state-exempt under Government Code Section 66323, the objective standards include:

  • Number: one ADU and one JADU are permitted on a lot with an existing single-family residence.
  • Setbacks: side and rear setbacks shall not be less than four feet.
  • Location: a detached ADU shall be located in the rear 50 percent of the lot, unless that standard precludes the development of a detached ADU, in which case it may be located within the front 50 percent of the lot.
  • Size: a detached ADU may be up to 850 square feet for a unit with one bedroom or less, and up to 1,000 square feet for a unit with more than one bedroom. A JADU may be up to 500 square feet.
  • Owner occupancy: for JADUs without independent sanitation facilities, owner occupancy of either the primary residence or the JADU is required. That tracks Government Code Section 66333, which limits an owner-occupancy requirement to JADUs that share sanitation facilities with the primary dwelling.

Government Code Section 66321 also requires local agencies to allow at least 850 square feet of interior livable space, or 1,000 square feet for an ADU with more than one bedroom, and to allow an ADU of at least 800 square feet of interior livable space with four-foot side and rear setbacks. If a local size or location standard would block one of those units, ask the City in writing how it will apply Section 18.30.170 together with state law.

Parking exceptions

For units that are not state-exempt, one parking space is required per unit or per bedroom, whichever is less. Tandem parking is permitted and may be located within setback areas. No replacement parking is required if a garage or carport is demolished to create an ADU. No additional parking is required if the ADU is:

  • within one-half mile walking distance of public transit;
  • within an architecturally and historically significant district;
  • within an existing primary residence or existing accessory structure;
  • within an area where on-street parking permits are required, but no permit is offered to the occupant of the ADU; or
  • within one block of a car-share vehicle.

Fees

No impact fees other than school impact fees shall be charged for an ADU or JADU with 750 square feet or less of interior livable space. School impact fees may be imposed on ADUs and JADUs greater than 500 square feet of interior livable space. Confirm current fee schedules with the City and the school district. If your unit is exactly 750 square feet, the code's "750 square feet or less" language should include it; still ask the City in writing how it will measure interior livable space for the fee.

Rules change, so confirm Section 18.30.170 and Table 18.31.01 with Suisun City Development Services before you submit. If you want help checking a Suisun City lot against these standards, book a free consultation.

Final Thoughts

A successful Suisun City ADU starts with the right track in Section 18.30.170: a state-exempt unit reviewed only against the state standards, or a larger or different unit that must also meet the City's objective standards. Use the City's 2026 code, not a copied checklist from another city, and ask Development Services in writing when a local rule and state law appear to point in different directions.